Portable stable scaffolding system for climbing high-altitude building construction scaffolding

Our ProductsProduct Description     Self-climbing Scaffolding System is an Safe and efficient building protection equipment emerging recently, especially, for high-rise building construction.     Its built-in safety screen design enclosing five floors once&nbs

Featured Products

Our Products
Product DescriptionPortable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold
     Self-climbing Scaffolding System is an Safe and efficient building protection equipment emerging recently, especially, for high-rise building construction.
     Its built-in safety screen design enclosing five floors once can effectively prevent workers and objects falling when operating forming a safety working area, as well as, reducing the impact of bad weathers.Modular design and reusable features offer convenient disassembly saving time, labour and materials. Automatic climbing device and anti - fall device greatly improve the efficiency by increasing the security of staff.
     Intelligent full steel wall attached auto-lifting scaffold specially custom for different construction projects facade safety protection.

Product Show
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold

Product sample
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold

Product Details
Product Name:Intelligent full steel modular attached type lifting scaffold  Linear(Horizontal)span:≤7m
Scaffolding Part Type:Scaffolding FramesBroken line or curve span:≤5.4m
Move Method:Attached Lifting ScaffoldingHorizontal Cantilever plate length:≤2m and no more than 1/2 span 
Construction Properties:Building ScaffoldFrame full height *support span:≤110
Application:High-rise/High Altitude building construction/Formworking supportingLifting Speed:12cm/Min
Certification:ISO9001,SGSAnti-falling breaking distance:≤ 80mm
Structural Style:IntegratedSynchronization error of adjacent positions:≤ 30mm
Color:Different color available Working load:≤ 2.0KN/, 3 floors & ≤ 3.0KN/, 2 floors
Surface Treatment:PaintedLifting load:≤ 0.5KN/, 2 floors
Supporting Mode:Wall climbing/ Hanging/ Attaching ScaffoldingRate power of hoist:500W
Specification:customizedRate load of hoist:7.5T
Distance from wall:30cmScreen windshield coefficient:0.42
Climbing Scaffolding Unit Height: ≤15m(no more than 5 floors)
Climbing Scaffolding Unit Width::0.7m 

Product Components
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold
Product Advantages
1.Independent research, development, manufacturing and processing, excellent quality, controllable schedule, top-ranking service
2.Wind resistance of punching net is increased by 90%, 0.42 is nearly half of the traditional wind shield coefficient of 0.8 
3.Modular structure of the climbing frame is easy to install and remove
4.On-site bolted installation reduces large area cutting and welding, saving material
5.Automatic lifting saves time and manpower, avoiding repeated setting
6.Hoister adopts standard cable, simple operation, strong  water and fire resistance
7.Upside down setting of Hoister facilitates the smooth walking on all layers of scaffolding
8.Wall-mounted device enhances the stability of scaffolding  with good anti-fall and anti-tilt performance
9.Control system is designed with overloading auto alarm and stop functions



Packing & Shipment
Packing:   Bundle, Package Box, Pallet, Container
Delivery Details: Generally it is 5-30 days, it is according to quantity.
Port:  Foshan,China
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold


Our Company & Factory
Company Brief 
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold    Foshan Gouyebao Formwork Construction Co., Ltd. is located in No.576, Gongye Dadao, Jingbu Village, Genghe Town, Gaoming District, Foshan city, Guangdong Province.
     Over 5years, there is a professional team exceed 300 staffs concentrate on building protection equipment self-climbing scaffolding and hydraulic auto-climbing formwork's design and manufacturing, as well as, professional climbing frame subcontracting, included intelligent scaffolding accessories, steel structures, climbing scaffold custom services and so on .
     We own latest professional machines like Guide Rail H Steel Welding Equipment, CNC series cutting machine, Large Sand Blasting Equipment etc. so that annual production capacity over 50000 Ton.

Production Process
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold

Projects
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold

Certifications
Portable Stable Scaffolding System Climbing High Altitude Building Construction Scaffold


FAQ

1. Q: Are you trading company or manufacturer?
    A: We are factory

2. Q: How long is your delivery time?
    A: The delivery time is within 5-45 days after received the deposit, please contact us for more details

3. Q: What is your terms of payment?
    A: 30% T/T in advance + 70% balance before shipment or LC at sight

4. Q: Is your product only sold as a whole?
    A: No, we also sell it in parts

5. Q: What is your main market?
    A.:Our main markets are Domestic Market,Middle East, Southeast Asia, Africa, European etc.

6. Q: What is your MOQ?
    A: 1 Set per time if out of stock. There is nothing requirement for our stock available.

7. Q. Can you provide special customized solution for us?
    A. Sure, customize service is available, that is one of our business. Please let us know your idea

8. Q: Can we visit your factory?
    A: Sure,feel free to contact us before your visit.The address is No.576, Gongye Ave, Tingbu Village, Genghe Town, Gaoming District, Foshan city, Guangdong, China

If you have any another questions, please feel free to contact us!

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours